Drop Head Beams Infill Beams Telescopic
|
|||
|
The quick action drophead supplied
complete with nuts and bolts is designed to fit on standard props or
adaptors for Cuplocks scaffolding. They allow panels and beams to be
struck and re-used after only 3 or 4 days, leaving the support in position
for the remainder of the curing period of the concrete slab. The primary
head remains in contact with the concrete while the secondary head and its
supporting wedge are released by a single hammer blow. The height of the
drophead is 214mm and the striking distance allows the beams and panels to
drop only 115mm for the their safe removal a marked improvement in terms
of speed and safety compared with other systems. The drophead has a load
carrying capacity of 40kN. Special care has been taken to ensure that
beams cannot be accidentally dislodged once located with the drophead
primed.
|
|
||
|